Features:
Home
Photos
Employee
Stories
Trip
Reports
About
The Author
Telegraph
Office Calls
PRR
Model Railroading
Histories:
History
of the Columbia & Port Deposit Railroad
Line Guide:
Sunnyside Yard-New York Penn Station
New
York Penn Station to Philadelphia 30th Street Station
Philadelphia
30th Street Station to Potomac Yard
Enola Yard to Perryville
Philadelphia
30th Street Station to Harrisburg
More lines to come soon!
Departments:
Discussion
List
Links
|
Pennsy
Under
The Wires
Line Guide:
Philadelphia 30th Street
Station to Harrisburg
Railfan
guide to this line. (Coming Soon)
Towers and interlockings along this line.
Branches that connect to this line.
Timetable
More to be added soon!
Special
thanks to Chris Ruhl.
Towers and interlockings along this line:
*Means Tower is still standing but is
in-active.
**Means tower is still standing and active.
+Means tower is in-active and has been demolished.
**ZOO- Which was created out of about 14 individual
towers, is being broken up...you guessed it...back to a
number of individual control points (not towers, but the
idea is the same). Ironically, there was a tower at
what is now MANTUA..back in the early 1900's, that was
absorbed into ZOO, and is now back to MANTUA again!
LOL! Just no "tower".
(?)VALLEY-Connection with SEPTA Ivy Ridge Branch.
**OVERBROOK-Crossovers.
*BRYN MAWR-Still stands after the basement fire on
January 1994 that finished the place and made it remoted
to PAOLI. Note 1
**PAOLI- The MU shop and yard no longer exist here. Still
needed to handle the BRYN MAWR interlocking and the 4-3
track reduction plant. May control a new remoted
interlocking at FRAZIER, not sure if THORN got the honors or not.
+GLEN-Connection with Morrisville Cut-Off. Note 2
+DOWNS-Crossovers. Note 2
**THORN- Still needed for some of the Conrail traffic on
the old Trenton Cut-Off (or, to some, the
"Morrisville Branch"), and to handle casual
freight on the old Atglen and Susquehanna that branches
off at PARK.
+CALN-West end of CR's Thorndale yard. Note 2
**PARK-More or less closed up, only open for trackwork,
which is once in a Blue Moon. The famous Atglen and
Susquehanna low-grade freight cut-off that was
constructed by PRR president Cassatt to help alleviate
crowded conditions many moons ago, branched off here and
made its way to Harrisburg eventually. The old
A&S is now abandoned except for a one-mile spur off
PARK to an industry in Atglen.
LEEMAN-Crossover and connection with Strasburg
Railroad(TBS).
**CORK- Handles stuff in the Lancaster, PA area.
FLORIN-Crossover (TBS).
ELIZABETHTOWN-Crossovers (TBS).
+ROY-Connection with CR Royalton branch. Note 3
**STATE-Harrisburg station terminal.
Notes:
1. - Remote controlled from PAOLI.
2. - Remote controlled from THORN.
3. - Remote controlled from STATE.
Branches that connect to this line:
Ivy
Ridge branch: SEPTA commuter branch to
Cynwyd. Diverges from mainline at VALLEY.
Morrisville
Cut-Off: For a description, see
the "Morrisville Cut-Off" description on the
"New York to Philadelphia" line guide. Diverges
from mainline at GLEN.
Enola
Branch: Operated by CR. Formerly known as
the Atglen & Susquehanna branch (when under PRR
control), stretches from PARK to Safe Harbor, PA, on the
Port Road branch. To my knowledge, the line is currently
abandoned.
Royalton
branch: CR operated. Diverges from
mainline at ROY and continues to
SHOCKS (Shocks Mill, PA), where it connects with the Port
Road branch
This
site last updated November 10, 1999.
For technical
questions or comments about this siite, please e-mail the
webmaster.
All other comments should be directed to the owner.
This site copyright © 2000. Nothing on this site may be
reproduced without the expressed, written permission of Pennsy Under The Wires and Josh Trower. Those who violate this will be punished to the
fullest extent under the copyright law.
|